Hello guyz it's my first time here and am facing a problem
i have CCR configured as pptp server and in another geographical place i have pptp client connected to the CCR pptp server
after configuring of pptp i just discover that my isp blocked eoip tunnel so i shift toward mpls/vpls
in the mpls/vpls configuration everything is ok and good till i reach the bridging area, when i add the vpls in the bridge in the client side it seems like a loop just run, and i couldn't discover where's the problem the main problem is before adding the vpls to the bridge i could have btest result 10 M
After i add it to the bridge btest result will be 20k
Inaddition i minimize my mtu to 1300 and i tun rstp
Kindly check scenario conf below:
------------------------------------
CCR:
kindly check mpls/vpls configuration : enabled: yes
lsr-id: 172.160.16.2
transport-address: 172.160.16.2
path-vector-limit: 255
hop-limit: 255
loop-detect: yes
use-explicit-null: no
distribute-for-default-route: yes
name="vpls1" mtu=1380 l2mtu=1500 mac-address=02:2F:9D:99:42:9D arp=enabled disable-running-check=no remote-peer=172.160.16.1 vpls-id=0:1 cisco-style=no
cisco-style-id=0 advertised-l2mtu=1500 pw-type=raw-ethernet use-control-word=default
---------------------------------
RB1100:
enabled: yes
lsr-id: 172.160.16.1
transport-address: 172.160.161
path-vector-limit: 255
hop-limit: 255
loop-detect: yes
use-explicit-null: no
distribute-for-default-route: yes
name="vpls1" mtu=1380 l2mtu=1500 mac-address=02:2F:9D:91:42:99 arp=enabled disable-running-check=no remote-peer=172.160.16.2 vpls-id=0:1 cisco-style=no
cisco-style-id=0 advertised-l2mtu=1500 pw-type=raw-ethernet use-control-word=default