I’m interested by putting the 4 RB5009 I have in 1U but hI am wondering how much the heat is dissipated. Do you think it will be OK in the summer ? For example would it work in room between 30-35° ? (which can happen when the AC fails or it’s too hot outside). Any feedback i welcome.
then you should also be concerned about the thermal contribution of the devices located above and below the 4 x rb5009 combo
in each case there may be numerous variables that influence the final result
off course you can’t expect the same thermal behavior
i think the most problematic situation is the vertical proximity between each pair of rb5009 an the potential contact area between them and cosecuently loss of contact with surrounding air
i think the most wise will be use the scheme of 4 x rb5009 in 1 RU in well ventilated site, if you have an already complicated thermal situation is not wise to make it worse stacking passsive equipment
i dont say that it will not work but surely you willl have hotter temperatures not only on rb5009’s, on close equipment you will see its temperature rise aswell
to the compendium of good ideas just add 10G BASE-T modules to the Mix, Why not ???
ok I see, wondering if someone tested this setup and provide some feedback though.
I think I ma have been interesting to provide a shelf that allws to put the power input and the router on it (or é routees) that would be awesome ![]()